Contoh 1

Question

What is the IBS Factor for the following Structural components?

(Refer Table 1 & 1A)

1.  Ground Floor

i)   Precast Concrete beam

ii)  Column with timber formwork

iii) All slab pre-stress plank except toilet area insitu

2. 1st Floor

i)Load bearing wall using  system formwork

3.  Roof

i)   Prefab roof truss.

 

ANSWER

By refering  the IBS Factor for the following Structural components?

(Refer Table 1 & 1A)

1.  Ground Floor = 0.8

2. 1st Floor = 0.6

3.  Roof = 1.0

 

Contoh Pengiraan Sistem Struktur


Diberi jumlah keluasan pembinaan 1,000 m2. 750 m2 menggunakan kaedah pasang siap (precast) beam/column/slab dan bakinya menggunakan kaedah konvensional

maka, keluasan penggunaan kaedah pasang siap (precast) beam/column/slab                =( 750m2/1000) x 100% = 75%

Keluasan penggunaan kaedah konvensional (insitu)                                                                     = (250 m2/1000) x 100% = 25%

pas tu… kena rujuk kat Table 1.

Daripada Table 1,    for precast beam/column/slab, F = 1.0

for in-situ, F = 0

Maka, bagi Part 1 (Structural System) IBS Score

= ( (75% x 1.0) + (25% x 0) ) x 50%

= 37.5 %

 

*Weih! dari mana pulak datangnya 50%? 50% merupakan nilai peratusan yang telah ditetapkan untuk sistem struktur bangunan. cuba tengok semula episod yg lepas, di mana saya ada letakkan formula pengiraan Skor IBS untuk sebuah bangunan

 

Diberi, jumlah panjang keseluruhan dinding ialah = 10,000 m run

Panjang dinding panel pasangsiap (precast panel) = 7 500m

maka, (7500/10 000) x 100% = 75%

Panjang dinding bata (brick)                                           = 2,500 m

maka, (2500/10 000) x 100% = 25%

 

dah dapat nilai ni, terus rujuk Table 1… eh salah… haaa… tengok… tak tumpu perhatian dalam kuliah saya hari tu. okay cepat selak Table 2 untuk Wall system.

Table 2, panel pasangsiap, F = 1.0

Table 2, dinding bata, F = 0

Dah pasti dengan nilai di atas, maka…

Maka, jumlah score Part 2 (Wall System)

= ( (75% x 1.0) + (25% x 0) ) x 20%

= 15%

 

Sampai sini… adakah menunjukkan saya dah terror dan dah tamat pengajian?

hmmm …  ada satu lagi sistem yang perlu dikira.

iaitu penggunaan jadual 3. untuk mengetahui lebih lanjut… kenalah hadiri kuliah saya… terima kasih…

 

SILA CUBA… DAN HANTAR UNTUK MENDAPATKAN MARKAH

AKTIVITI 1

Question

What is the IBS Factor for the following Structural components?

(Refer Table 1 & 1A)

1.  Ground Floor

i)   Beams:  Precast concrete beams

ii)  Columns :  In-situ concrete using steel formworks

iii) Floor slab:  Precast half slabs floor

 

2. 1st Floor

i) Internal wall:  Precast concrete panel

ii) External wall:  Precast blockworks

3.  Roof

i)  Roof truss:   Prefabricated timber roof truss

 

AKTIVITI 2

Dapatkan skor IBS bagi maklumat di bawah

Say, from measurement taken from drawings:

1)  Construction area

i)  Construction area ground floor    =  189.0 m2

ii) Construction area 1st floor              =  189.0 m2

iii) Construction roof area                     =  189.0 m2

 

2)Structural Systems

i)   Beams:  Precast concrete beams

ii)  Columns :  In-situ concrete using steel formworks

iii) Floor slab:  Precast half slabs floor

iv)  Roof truss:   Prefab steel roof truss.

 

3)  Wall System

i) Internal wall:  Precast concrete panel

ii) External wall:  Precast blockworks

 

4) Other simplified construction solutions

i)   Beams:  70 % complies to MS 1064

–    Columns:   100% complies to MS 1064

–   Walls and slabs:  Less than 50% complies to MS 1064

–    Doors :  85% complies to MS 1064

–    Windows:   50% complies to MS 1064

ii)   Horizontal repetition of structure = 100%

 

SEMOGA BERJAYA (^_^)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Tag Cloud

%d bloggers like this: